Sorry for the confusion, I my statement about 2 months for Hoster.
This time frame included; ordering all necessary PC parts for my rackmount computer, system assembly, ordering Hoster, PC setup, PC checkout, and loading approx 4500 songs from approx 350 dcg disc's. All of this was done in the evenings after a full day at work. This was a 3-4 hr average each night.
I completely had the system checked out at home before I attempted to use in in a show. The time was well worth the effort. My 1st Hoster show was flawless.
I would do it all over again, any day!
"HOSTER" is GREAT!!
Thanks again to MTU for their great efforts on this program.
Later,
kj n texas
